MUTHAARA GARDEN PROJECT
Luxury residential estate development with landscaped gardens and modern finishes.
OngoingKALANGA PROJECT
Multi-unit DISPENSARY construction with reinforced concrete and quality masonry.
OngoingCOMMERCIAL APARTMENT PROJECT
Modern commercial apartment development designed for urban living and retail.
CommercialRunda Plot 98
Was given a sub contract by ASSOCIATION CIVIL ENGINEERING AND CONSTRUCTION COMPANY
CompletedRUNDA Residency
A swing in the yard and roof top water proofing solution Your dream home deserves more than just a builder it deserves a team that understands the vision behind it. 🏡 At TS, we combine experience, craftsmanship, modern design and attention to detail to turn your ideas into a home you’ll be proud of for generations. We don’t compete on price. We compete on quality, trust and the experience we give our clients. From the first site visit to the final finish, your dream is our responsibility. — THE BUILDERS TS CONTRACTOR'S LTD 📞 +254727387139 DESIGN • BUILD • FINISH https://www.tscontractorsltd.co.ke
OngoingONE-STOREY MANSION DEVELOPMENT (KANTAFU SITE)
Company Details: The Builder's T & S Contractors Ltd, operating under the website www.tscontractorsltd.co.ke, with its location in Nairobi/Kantafu, Kenya, and email address tumboandsonscontractorsltd@gmail.com. Project Reference: Dated July 22, 2026, with Quotation Reference TS/KTF/2026/08-REV and price status aligned with ground rates. Client Details: Prepared for Eng. Robinson Wekesa Masika, serving as the Client Representative and Project Owner for the Kantafu Site Project. Foundation Stage Works: Materials subtotal is KSh 289,000, which includes structural steel columns, foundation quarry stones, cement, river sand, ballast aggregates, BRC reinforcement mesh, hoop iron binding ties, and high-yield reinforcement steel bars (D8). Foundation labor and masonry work is KSh 160,000. Total Foundation Stage Cost: KSh 449,000. Superstructure Walling Stage Works: Materials subtotal is KSh 319,800, which includes machine cut building stones (9x9 and 6x9), cement, rock sand, rock dust, hoop iron binding rolls, and high-yield reinforcement steel bars (D10 and D8). Walling labor and masonry work is KSh 120,000. Total Walling Stage Cost: KSh 439,800. Consolidated Budget Summary: Total Materials Cost: KSh 608,800. Total Labor Cost: KSh 280,000. Total Estimated Project Cost: KSh 888,800. Payment Details: M-Pesa: 0727 387 139 (Eric Tumbo). Equity Bank: 0650199304704 (Account Name: Eric Wanyama). Signatories: Prepared and issued by Eng. Eric Tumbo (CEO/Lead Engineer, The Builder's T & S Contractor's Ltd), and approved and accepted by Eng. Robinson Wekesa Masika (Client Representative / Project Owner). STAGE BY STAGE WORK PROPOSED ONGOING.....
Ongoing3 BEDROOM BUNGALOW HIPPED ROOF DESIGN LUGULU WEBUYE
Project Details: Client: Sharlyne Site Location: Webuye Lugulu Site Engineer: Eric Tumbo (Operating under The Builder's T & S Contractors Ltd) Contact: 0727387139 Website: www.tscontractorsltd.com Project Details: Dimensions & Layout: Overall Width: 15.24 m Master Bedroom: 4.0 m x 4.0 m featuring an en-suite bathroom (2.44 m x 1.83 m). Additional Bedrooms: Two bedrooms measuring 3.5 m x 3.5 m each, positioned near a second bathroom (2.13 m x 1.83 m). Living Room: Spacious lounge area measuring approximately 4.85 m x 4.27 m. Kitchen & Pantry: Kitchen sized at 3.66 m x 3.05 m with an adjoining pantry (2.44 m) and a rear kitchen yard. Dining Area: Centrally located dining space positioned next to the kitchen. Entrance / Porch: Front entry porch area with dimensions of 4.5 m x 2.5 m.
OngoingBRICKS WALLING 3 BEDROOM BUNGALOW HIPPED ROOF DESIGN
Standard Clay Bricks approx. 8,000 pcs x 8bob each= 64,000 Cement (~270 Bags for foundation, walling, plaster, screed) = 227,500.00 River Sand & Ballast / Aggregates=125,000.00 Hardcore, Murrum & Foundation Stones=80,000.00 Reinforcement Steel (Y12, Y10, R8 bars, binding wire)=90,000.00 Timber (Roof framing, formwork, scaffolding)=120,000.00 Roofing Sheets (Hipped roof) & Accessories=110,000.00 DPC, DPM & Gladiator Termite Control Chemicals=40,000.00 Nails, Miscellaneous Hardware & Site Sundries=35,000.00 Labor quote 700,000/=KSH All from scratch to interior designing finishing up tilling work and painting glass installation Official Payment Details M-Pesa: 0727 387 139 (Eric Tumbo) Equity Bank: 0650199304704 Account Name: Eric Wanyama Best regards, Eng. Eric Tumbo The Builder's T & S Contractor's Ltd
CompletedKIPKAREN RIVER LUGARI HIDDEN ROOF DESIGN PROJECT
standard clay bricks 1500pcs @ 10 = 15,000 River sand 3 trips of tractor @7k =21,000 Ballast Kokoto 2 TRIPS= 14k Cement 50 bags @1k=50,000 Labor 250,000 Structure + Roofing including plastering work and floor screeding window and door steel fittings
CompletedBUSHENYI PROJECT (UGANDA)
_Modern Perimeter wall designing and sliding gate with pedestrian gate Arched design _SQ & sauna proposed _ Swimming pool _Rooftop Gazebo _ Renovation Bungalow hipped roof design to modify modern family farm house with €100,000 USD 116,210 for interior designing and landscaping
Completed4 BEDROOM MAISONETTE (MIGORI COUNTY)
13.5 Million project from scratch to interior designing key handover Standard ceramic tiles, regular aluminum windows, standard sanitaryware, flush doors, basic gypsum ceilings, and standard balustrades. Key Project Budget Breakdown Components: Sub-structure & Foundation (10-15%): Excavation, anti-termite treatment, hardcore filling, blinding, and reinforced concrete strip foundations/slabs. Super-structure (25-30%): Machine-cut stone walling, columns, beams, staircase construction, and the first-floor suspended concrete slab. Roofing (10-15%): Timber/steel trusses, timber ceiling boards, and roofing sheets (such as Decra or similar profile roofing specified in your notes). Finishes & Interior Fit-out (20-25%): Plastering, internal/external painting (Weathershield/emulsion), floor and wall tiling, aluminium casement windows, doors, complete bathroom fittings, and basic interior joinery. M&E Installations (10%): Complete first- and second-fix electrical wiring, plumbing, and drainage infrastructure linked to the septic details. Note: This estimation covers construction and interior fit-outs up to hand-over, but excludes external site boundary walls, detached gates, professional fees (architect, engineer, quantity surveyor), and local county approval charges.
OngoingPROPOSED RESIDENTIAL 3 BEDROOM BUNGALOW DEVELOPMENT IN KIJAURI, NYAMIRA COUNTY
PROPOSED RESIDENTIAL BUNGALOW DEVELOPMENT IN KIJAURI, NYAMIRA COUNTY tscontractorsltd.co.ke M-Pesa Mobile Number: 0727 387 139 (Account Name: Eric Tumbo) Equity Bank Transfer: Account No. 0650199304704 Equitel Line: +254 763 427 819 Payment Reference: Please use your Name or Site Reference (Kijauri Bungalow) in the payment narration. Send confirmation slips to tumboandsonscontractorsltd@gmail.com. SECTION 1: BILLS OF QUANTITIES (SUMMARY OF WORKS) 1.Site clearance, removal of topsoil (average 200mm deep) 2.Excavate for strip foundation (width 600mm, depth 1000mm) 3.Plain concrete blinding (Class 15/20, 50mm thick) 4.Foundation walling in 200mm /150mm thick machine-cut stone 5.Damp Proof Membrane (DPM 1000 gauge) & Anti-termite treatment 6.150mm thick reinforced concrete ground floor slab (Class 20) (B)SUPERSTRUCTURE WALLING & COLUMNS 1.200mm thick external machine-cut stone masonry walls 2.150mm thick internal partition walls 3.Reinforced Concrete Columns (300x200mm) & Ring Beams (C) ROOFING & RAINWATER GOODS 1.Treated cypress roof timber (trusses, purlins 100x100mm}, rafters 150x50mm} 2.Stone-coated roofing tiles complete with ridges and accessories 3.PVC Rainwater goods (gutters, downpipes 100mm diam.) (D)FINISHES (Wall, Floor & Ceiling) 1.Internal & external wall plastering (average 15mm thick) 2.Floor tiling (ceramic tiles for living, kitchen, wet areas) 3.Timber block flooring / specialist floor finishes for bedrooms 4.Softboard ceiling on 50x50mm} timber brandering (600mm} c/c) (E)WINDOWS, DOORS & FITTINGS 1.Steel casement windows complete with burglar proofing{ITEM} 2.External & internal flush/paneled doors with ironmongery{ITEM} (F)SERVICES (Plumbing, Drainage & Electrical) 1.Sanitary fixtures, water supply piping & drainage{ITEM} 2.Complete electrical conduit piping, wiring, and fittings{ITEM} ESTIMATED TOTAL PROJECT COST (KES)3,433,450.00 Prepared By: Eng. Eric Tumbo Managing Director | Structural Engineer The Builder's T & S Contractor's Ltd Email: tumboandsonscontractorsltd@gmail.com / ericktumbo643@gmail.com
Ongoing