Selected Work
A look at recent projects and the quality of craftsmanship we bring to every build.
MUTHAARA GARDEN PROJECT
Luxury residential estate development with landscaped gardens and modern finishes.
OngoingKALANGA PROJECT
Multi-unit DISPENSARY construction with reinforced concrete and quality masonry.
OngoingCOMMERCIAL APARTMENT PROJECT
Modern commercial apartment development designed for urban living and retail.
CommercialRunda Plot 98
Was given a sub contract by ASSOCIATION CIVIL ENGINEERING AND CONSTRUCTION COMPANY
OngoingONE-STOREY MANSION DEVELOPMENT (KANTAFU SITE)
Company Details: The Builder's T & S Contractors Ltd, operating under the website www.tscontractorsltd.co.ke, with its location in Nairobi/Kantafu, Kenya, and email address tumboandsonscontractorsltd@gmail.com. Project Reference: Dated July 22, 2026, with Quotation Reference TS/KTF/2026/08-REV and price status aligned with ground rates. Client Details: Prepared for Eng. Robinson Wekesa Masika, serving as the Client Representative and Project Owner for the Kantafu Site Project. Foundation Stage Works: Materials subtotal is KSh 289,000, which includes structural steel columns, foundation quarry stones, cement, river sand, ballast aggregates, BRC reinforcement mesh, hoop iron binding ties, and high-yield reinforcement steel bars (D8). Foundation labor and masonry work is KSh 160,000. Total Foundation Stage Cost: KSh 449,000. Superstructure Walling Stage Works: Materials subtotal is KSh 319,800, which includes machine cut building stones (9x9 and 6x9), cement, rock sand, rock dust, hoop iron binding rolls, and high-yield reinforcement steel bars (D10 and D8). Walling labor and masonry work is KSh 120,000. Total Walling Stage Cost: KSh 439,800. Consolidated Budget Summary: Total Materials Cost: KSh 608,800. Total Labor Cost: KSh 280,000. Total Estimated Project Cost: KSh 888,800. Payment Details: M-Pesa: 0727 387 139 (Eric Tumbo). Equity Bank: 0650199304704 (Account Name: Eric Wanyama). Signatories: Prepared and issued by Eng. Eric Tumbo (CEO/Lead Engineer, The Builder's T & S Contractor's Ltd), and approved and accepted by Eng. Robinson Wekesa Masika (Client Representative / Project Owner). STAGE BY STAGE WORK PROPOSED ONGOING.....
Ongoing3 BEDROOM BUNGALOW HIPPED ROOF DESIGN LUGULU WEBUYE
Project Details: Client: Sharlyne Site Location: Webuye Lugulu Site Engineer: Eric Tumbo (Operating under The Builder's T & S Contractors Ltd) Contact: 0727387139 Website: www.tscontractorsltd.com Project Details: Dimensions & Layout: Overall Width: 15.24 m Master Bedroom: 4.0 m x 4.0 m featuring an en-suite bathroom (2.44 m x 1.83 m). Additional Bedrooms: Two bedrooms measuring 3.5 m x 3.5 m each, positioned near a second bathroom (2.13 m x 1.83 m). Living Room: Spacious lounge area measuring approximately 4.85 m x 4.27 m. Kitchen & Pantry: Kitchen sized at 3.66 m x 3.05 m with an adjoining pantry (2.44 m) and a rear kitchen yard. Dining Area: Centrally located dining space positioned next to the kitchen. Entrance / Porch: Front entry porch area with dimensions of 4.5 m x 2.5 m.
OngoingBRICKS WALLING 3 BEDROOM BUNGALOW HIPPED ROOF DESIGN
Standard Clay Bricks approx. 8,000 pcs x 8bob each= 64,000 Cement (~270 Bags for foundation, walling, plaster, screed) = 227,500.00 River Sand & Ballast / Aggregates=125,000.00 Hardcore, Murrum & Foundation Stones=80,000.00 Reinforcement Steel (Y12, Y10, R8 bars, binding wire)=90,000.00 Timber (Roof framing, formwork, scaffolding)=120,000.00 Roofing Sheets (Hipped roof) & Accessories=110,000.00 DPC, DPM & Gladiator Termite Control Chemicals=40,000.00 Nails, Miscellaneous Hardware & Site Sundries=35,000.00 Labor quote 700,000/=KSH All from scratch to interior designing finishing up tilling work and painting glass installation Official Payment Details M-Pesa: 0727 387 139 (Eric Tumbo) Equity Bank: 0650199304704 Account Name: Eric Wanyama Best regards, Eng. Eric Tumbo The Builder's T & S Contractor's Ltd
CompletedKIPKAREN RIVER LUGARI HIDDEN ROOF DESIGN PROJECT
standard clay bricks 1500pcs @ 10 = 15,000 River sand 3 trips of tractor @7k =21,000 Ballast Kokoto 2 TRIPS= 14k Cement 50 bags @1k=50,000 Labor 250,000 Structure + Roofing including plastering work and floor screeding window and door steel fittings
OngoingBUSHENYI PROJECT (UGANDA)
_Modern Perimeter wall designing and sliding gate with pedestrian gate Arched design _SQ & sauna proposed _ Swimming pool _Rooftop Gazebo _ Renovation Bungalow hipped roof design to modify modern family farm house with €100,000 USD 116,210 for interior designing and landscaping
Completed